20 Yard

Kitchen Remodel

  • Clients:

    Lauren Whitfield

  • Category:

    20 Yard

  • Date:

    20 March, 2026

  • Tags:

    CabinetsDrywallRemodel

A full kitchen remodel meant old cabinets, countertops, drywall, and flooring all coming out over the course of a week. We placed a 10 yard dumpster in the driveway close to the front entry, so the crew could carry debris straight out without tracking it through the rest of the house.

Cabinets and countertops are bulky, not just heavy, container placement matters as much as size.

Old cabinetry and countertop material take up space awkwardly, even when the total weight is manageable for a 10 yard container. Placing the dumpster close to the work area cut down on carry distance for the crew and kept the job moving faster than if it had been staged further down the driveway.

  • Delivered ahead of demo day.
  • Positioned near the front entry for short carries.
  • Swappable if the remodel ran long.
  • Removed the same day demo wrapped up.
Firebird Dumpster Rental

Hi! Before we get started, tell us a bit about you so we can follow up if we get disconnected.

Email or phone, at least one.

Hi! I'm here to help with dumpster sizing, pricing, and booking. What can I help you with today?